Bathroom Remodeling · Roseville, CA

The bathroom youstart the day in.

For the primary bath whose shower pan is quietly failing, the guest half-bath you’ve been avoiding for ten years, or the room that fit a 1995 family and doesn’t fit yours: a family-owned Roseville contractor who plans the bathroom with you before any construction starts. Serving the greater Sacramento region since 2022.

  • CSLB 1099913
  • Family-owned since 2022Est. 2022
  • 8+ Sacramento-region markets8+ markets

Why Revitalize Construction

The room you use firstand last every day.

It’s also the room most likely to turn into a quiet daily grievance by year ten: the shower that drips when the toilet flushes, the vanity drawer that catches, the fan that never actually cleared the fog from the mirror, the grout line that darkened a shade a year.

We’re Revitalize Construction: two brothers, Zak and Jake, running a family-owned general contractor out of Roseville since 2022. We plan the bathroom with you first and build it second. You’ll hear about changes before we make them.

A finished Revitalize Construction bathroom, Roseville-area family home
  • Two names
    on the door

    Zak and Jake sign every bid. The person you meet at the first walk-through runs the job through final punch, not a sales rep with a script.

  • Planning
    before any hammer

    We walk your current layout with you first: where the morning routine breaks down, where two people trip over each other. Then we design the new bathroom around what we see.

  • One team,
    start to finish

    No handoffs between a sales rep, a designer, and a project manager you’ve never met. One direct line from the first quote through the final walk-through.

  • Honest budget
    conversations

    We talk real ranges before anyone picks a tile. If your scope doesn’t fit the band, we say so up front, not after demo opens the walls.

What makes a great bathroom

Things that matter morethan the finishes.

The tile carries the Instagram photo. These carry the decade.

  1. [ 01 ]

    Waterproofing before finishes.

    The pan under the shower, the membrane behind the tile, the slope of the floor to the drain: these are the things that decide whether the bathroom lasts fifteen years or you’re opening it back up at five. We detail those first, before anyone picks tile.

  2. [ 02 ]

    Lighting layered to the task.

    A single overhead and nothing else is the most common mistake in older bathrooms. The mirror where you actually shave, the ceiling over the tub, the shower corner, the kick under the vanity: each wants its own circuit, each wants a dimmer.

  3. [ 03 ]

    Materials chosen for how they’ll age.

    Honed porcelain hides water spotting. Light grout darkens where the water pools. Brushed metals hide the inevitable fingerprints better than polished ones. We’ll be straight about which finishes carry the way your family uses the room.

  4. [ 04 ]

    Vanity heights sized to the user.

    Standard vanity height is 32 inches, which is often too low for the person who actually uses it. Comfort height runs 36. We ask who’s at the sink the most, and we size the vanity around that person’s shoulders, not the catalog default.

Bathroom remodeling services

Six decisionsthat make the bathroom.

Everything a full bathroom remodel actually involves: the honest version, each with the trade-off we’ll walk through with you before you pick.

  1. The room that holds a weekday morning.

    01 · The Layout

    The room that holdsa weekday morning.

    The right layout decides whether your morning routine runs smoothly or breaks down. Two people at the same vanity, a shower door that doesn't swing into the toilet, a water closet separate enough to actually close. The bathroom we design should hold a weekday morning without anyone having to wait their turn or step around someone else.

    What to consider

    “When did your morning routine last feel easy, instead of a sequence of frustrations you've learned to live with?”

    Moving the toilet drain or the shower pan is real plumbing: a trench, a reroute, a pressure test. A reworked vanity in the existing footprint changes daily feel more than most finishes will.

  2. The ten minutes that actually set your day.

    02 · The Shower

    The ten minutes thatactually set your day.

    The shower is the ten minutes you can't skip, and the one thing in the room that fails loudest when it's built badly. A curb that leaks, a bench placed where the hot water never lands, a hand-shower that doesn't reach the shampoo. We talk through pressure, drain slope, and glass placement before the tile even gets picked, because the pretty part only lasts if the waterproofing underneath is right.

    What to consider

    “What do you quietly fix in your current shower every morning without even noticing anymore?”

    A proper hot-mop or sheet-membrane pan plus a linear drain is the difference between a shower that lasts fifteen years and one you're regrouting at five. Not the splashiest line item, the most important one.

  3. The drawer you reach for in the dark.

    03 · The Vanity

    The drawer you reachfor in the dark.

    The vanity decides what the room feels like at 6 a.m., not just in the listing photo. A drawer that opens past the toilet without hitting it, outlets inside the cabinet so the hair dryer doesn't live on the counter, a top you can set a wet razor on without a stain. Comfort-height for taller adults, standard for shorter ones; the catalog default fits almost nobody perfectly.

    What to consider

    “Which drawer in your current vanity do you avoid opening because of what falls out of it?”

    Semi-custom cabinets land in the sweet spot for most Sacramento-region bathrooms. Fully custom earns its price when the room has an odd dimension or you want a wall-hung vanity on a shared plumbing wall.

  4. The tile that still reads clean in year ten.

    04 · The Surfaces

    The tile that stillreads clean in year ten.

    Tile and stone are what the room looks like for the decade after we leave. Some glazes hide hard-water spotting; others show every drip you forget to wipe. Grout color decides whether the floor still reads crisp in year three or starts looking tired by year one. We'll be honest about which surfaces hold up to the way your family actually uses the room, and which ones look great in a showroom and tired in a house.

    What to consider

    “What marks are you willing to live with on these surfaces, and which ones would make you wince every morning?”

    If you're on hard water (parts of Granite Bay, El Dorado Hills), skip the dark polished stone on the shower walls. Honed, lighter, and sealed is the version that doesn't need weekly attention.

  5. The room that reads right at six and at ten.

    05 · The Light & Air

    The room that readsright at six and at ten.

    A single overhead and a fan on the same switch is the most common lighting mistake in older bathrooms. The right plan layers it: bright at the mirror for shaving, warm overhead for soaking, soft on dimmer at ten p.m. Ventilation sits in the same conversation, because the fan sized to the room is what keeps the paint from peeling and the mirror from fogging solid every shower.

    What to consider

    “What time of day do you want this room to actually feel good to walk into?”

    A dimmer on every warm circuit, a bath fan on a humidity sensor so it runs until the room is actually dry: two small line items that change how the room ages more than any finish choice.

  6. The faucet that still feels good in year eight.

    06 · The Fixtures

    The faucet that stillfeels good in year eight.

    The fixtures are what your hand touches every day: faucet handles, shower valves, toilet flush, drain stopper. Cartridge quality decides whether the shower still mixes smoothly after a thousand showers or starts dripping at year three. Finish choice decides whether the metal pits in a hard-water house or holds its tone. Fixtures aren't about brand badges, they're about the hundred small moments of the room working or not.

    What to consider

    “Which fixture in your current bathroom do you quietly curse every time you use it?”

    A pressure-balance shower valve is code; a thermostatic one costs more and holds the temperature when someone flushes the toilet downstairs. Worth the upgrade if you have a shared supply line.

Before & after

A bathroom that readsdifferently after.

Drag the handle to see the room the family was living with against the room they live in now.

A finished bathroom remodel by Revitalize Construction, showing the completed designAfter
The original bathroom before the Revitalize Construction remodel beganBefore

a Folsom family · primary suite rebuild

A corner tub swapped fora curbless wet zone.

Bath size
~ 95 sq ft
Vanity
Rift white oak, double
Surfaces
Honed porcelain
On-site
7 weeks

A dated 1990s primary bath with an unused corner tub became a curbless wet zone and a double-vanity run against the opposite wall. The toilet moved to its own alcove, the shower picked up a linear drain and a bench, and the window stayed.

Start Your Bathroom

Investment bands

Three bands,three honest conversations.

Primary baths we rebuild tend to start from one of three places. Each card names the kind of bath it fits and what it includes, priced from the starting figure for construction. Pick the one that sounds like your project.

ClassicBathroom Remodel

Starting at $80,000

Best for a full primary bath rebuild that keeps every fixture where it is, with new tile, vanity, tub, and walk-in shower.

What’s included

  • Same footprint, everything replaced in place
  • Tub and tile walk-in shower
  • Entry-level semi-custom vanity
  • Granite or engineered quartz counters
  • Tile shower and tile floor, standard patterns
  • Minimal plumbing and electrical rework
  • Standard fixtures and lighting
  • 6+ week timeline

PremierBathroom Remodel

Starting at $150,000

Best for a primary bath redrawn from scratch, expanding into closet or bedroom space with custom cabinetry throughout.

What’s included

  • Complete floor plan redesign
  • Expansion into closet or adjacent space, including wall removal
  • Custom vanity and cabinetry throughout
  • Marble, quartzite, or premium quartz counters
  • Tile shower and floor with upgraded patterns, accent walls
  • Full plumbing and electrical relocation
  • Designer fixtures and lighting
  • 12+ week timeline

Hall and guest baths too: a standard 5×8 starts at $25,000 with builder-grade finishes and the plumbing where it is. Every one is a full gut remodel, down to the studs.

Starting prices are construction only. Planning, design, and permitting run through our pre-construction agreement, required on every project and credited back when you sign the construction agreement. Your actual number depends on existing conditions, material selections, and anything we find once the walls open. We’ll give you a real range at the site walk and a locked price after design and selections, not before.

The bathroom process

Five steps.You approve each one.

Every stage of the bathroom build has a deliverable you can hold, review, and sign off on before we move to the next one.

[ 01 ]

Walking your bathroom

We stand in your current bathroom and watch where it works and where it doesn't: the morning rhythm, where two people trip over each other, the shower corner you've learned to avoid. We ask who uses it, how often, and what the room has to hold on a school-morning Tuesday. Free, up to an hour, and an honest read before we draw.

[ 02 ]

The bathroom plan

Floor plan, vanity elevations, fixture package, lighting and electrical plan, waterproofing detail, all on one set of drawings so the trades line up before anyone orders tile. 3D views where they help you decide between a walk-in shower vs. a soaker tub or a single vs. a double vanity. Nothing moves to pricing until you've signed off on the plan.

[ 03 ]

Selections & pricing lock

You pick the specific vanity line, countertop slab, floor and wall tile, shower-glass detail, and plumbing fixtures. Allowances get swapped for real line items so the final number is honest, not a placeholder. Change orders after this point get documented and priced before any work shifts.

[ 04 ]

The build

Bathroom demo, then rough-in (plumbing moves, electrical, framing changes), waterproofing, drywall, tile, vanity install, countertop template and install, fixture set, finish. One lead carpenter owns the schedule and your questions. Weekly written updates so you know what finished last week and what's starting Monday.

[ 05 ]

The handoff

We walk the finished bathroom with a punch list in hand: a vanity drawer to balance, a caulk line to touch, a shower-door sweep to adjust. You get the fixture warranty folder, tile and grout care notes, waterproofing documentation, and a one-year check-in on your calendar.

Areas we service

Bathrooms acrossthe Sacramento region.

Crews roll out of Roseville daily. Dispatch range covers Placer, Sacramento, and El Dorado counties.

What people ask

Common questions,honest answers.

Something not covered here? Ask us on the first call. There’s no wrong question.

How long does a bathroom remodel take on-site?

On-site time starts at about 6 weeks for a Classic bath, 9 for a Signature and 12 for a Premier, counted from demo, and grows with scope. Add 3–6 weeks of design, selections, and permit review ahead of that. We'll give you a realistic range at the brief stage, not after you've signed.

Do we have to live without this bathroom while you build?

Yes, this one is out of service during the build. Most families manage by using a second bath in the house for the duration. If this is your only bathroom, we talk about a temporary setup, phased plumbing, or a short-term rental for the loudest two weeks. We'll be honest if we think a rental is the easier call.

Can you work with the designer we've already hired?

Yes. We work with homeowners' designers, architects, and bathroom specialists regularly. We'll fold your designer into our planning conversations early so the drawings and the build line up before anyone orders tile.

What happens if you open a wall and find something unexpected?

Old houses hide surprises: galvanized supply pipes nobody flagged, a joist cut around a drain, a shower pan with a hairline leak that rotted a sill plate under the tile. If we find one, work stops, we document it, and we come back to you with options and real pricing before we touch anything. Nothing gets fixed on an assumption, and nothing gets billed without a change order you've seen.

What's your warranty on the vanity, tile, and waterproofing?

Our workmanship on installation is warranted for one year. Vanities carry whatever manufacturer warranty the line comes with, typically five years on semi-custom cabinets and lifetime on quality drawer hardware. We'll tell you what each specific line covers before you pick it. Tile and grout are warranted on the install for one year; the waterproofing membrane under the shower pan carries a separate manufacturer warranty we document for you at handoff.

Do you take on smaller bathrooms, like a hall bath?

Yes. A standard 5x8 hall or guest bathroom starts at $25,000 with builder-grade finishes and the plumbing where it is. Every small bath we take on is a full gut remodel, down to the studs, so the waterproofing and the supply lines behind the new tile are new too. A designer works on it like any other project.

Do you design the bathroom, or should we bring plans?

Both work. Every project has a designer on it: ours, for homeowners who want it handled start to finish, or the designer or architect you've already engaged. If you bring plans, we'll read them carefully and tell you honestly where we see trade-offs the drawings don't flag yet: ventilation sizing, drain slope, glass clearance.

How does the budget conversation actually work?

At the site walk we'll give you a rough band based on scope, fixtures, and the condition of the existing room. After design and selections, we move to final line pricing: real numbers against specified products, not allowances. If the number comes in higher than the band, we tell you where and why, and talk through what we'd cut or swap. We'd rather lose the project at the band stage than surprise you at the contract stage.

Other services

The rest of the workunder the same roof.

Same team, same planning-first approach, same license and warranty paperwork. If the bathroom is part of a bigger scope, these pages tell you how each piece gets handled.

KitchenRemodeling

The room your family actually lives in, not the one on the floor plan. We walk every wall before demo so the appliance work, the cabinetry run, and the structural pieces behind them are settled before the first countertop gets specified.

See how we do kitchens
HomeRemodeling

When more than one room needs to catch up with the family. A kitchen and two baths, the kitchen opened to the living and dining rooms, or the whole house: we plan the rooms together and sequence the trades so the family can keep living around the work.

See how we do home remodels
RoomAdditions

The square footage you have been talking about for years. We handle foundation through finish: permitting, structural engineering, trade coordination, and the exterior envelope. The result reads as part of the house rather than tacked on at the end.

See how we do additions
Aging in Place& Accessibility

For the family deciding this is the house they stay in. Barrier-free bathrooms, wider doors, ramps, and ceiling lifts, planned around how your family actually moves through the house rather than a code book. A Regional Center Approved Vendor across seven Northern California counties.

See how we plan for aging in place
InsuranceReconstruction

The rebuild starts the day you decide the loss is behind you. We read your carrier's estimate line by line against what the structure actually requires, document the supplements it missed, and run the reconstruction so the finished house feels like home again.

See how we do loss rebuilds

Start here

Not sure whichof these you need?

A site walk sorts the bathroom scope from a larger home remodel. Honest answer within a week.

Start Here

You’ve been thinkingabout this for a while.

Tell us what isn’t working. We’ll come out, look at the bathroom, and send a scope and ballpark within a week. If it isn’t a fit, that’s an honest answer we’re both better off with.

Follow Us

Request a Quote

Tell us about your bathroom.

We’ll reply within one business day with a next step: a quick call, a site walk, or a scope outline.