Home Remodeling · Roseville, CA

The home yourfamily grows into.

For the house that fit your family in 1998 and hasn’t caught up since: the kitchen walled off from the room everyone wants to be in, two baths still wearing the original tile, a dining room nobody eats in. Two rooms or the whole floor plan, a family-owned Roseville contractor who plans every room with you before any construction starts. Serving the greater Sacramento region since 2022.

  • CSLB 1099913
  • Family-owned since 2022Est. 2022
  • 8+ Sacramento-region markets8+ markets

Why Revitalize Construction

The house your familygrew out of years ago.

It’s the house you bought when the kids were little and the kitchen was far enough from the bedrooms. Now there are teenagers slamming doors, you work from a corner of the dining room, and nobody can agree whether the TV goes above or next to the fireplace. The house hasn’t caught up with the family it holds.

We’re Revitalize Construction: two brothers, Zak and Jake, running a family-owned general contractor out of Roseville since 2022. We plan every room in the scope with you first and build it second. You’ll hear about changes before we make them.

A finished Revitalize Construction home remodel, Roseville-area family home
  • Two names
    on the door

    Zak and Jake sign every bid. The person you meet at the first walk-through runs the job through final punch, not a sales rep with a script.

  • Planning
    before any hammer

    We walk the whole house with you first: the rooms you avoid, the walls you’ve always wanted to open. Then we design the new scope around what we see.

  • One team,
    start to finish

    No handoffs between a sales rep, a designer, and a project manager you’ve never met. One direct line from the first quote through the final walk-through.

  • Honest budget
    conversations

    We talk real ranges before anyone picks a tile. If your scope doesn’t fit the band, we say so up front, not after demo opens the walls.

What makes a great home remodel

Things that matter morethan the floor plan.

The layout carries the Instagram photo. These carry the decade.

  1. [ 01 ]

    Flow before finishes.

    The way your family moves through the house decides more than any paint color. The route from front door to kitchen, from garage to mudroom, from the primary suite to the coffee. We draw those paths first, then design the finishes to support them.

  2. [ 02 ]

    A phasing plan you can live with.

    On a multi-room remodel, the family’s year matters as much as the plan. Where you sleep in month three, where meals come from in month five, which kids’ rooms stay off the job site. We draw the phasing before we draw the finishes.

  3. [ 03 ]

    One palette, room to room.

    A remodel that reads as one home, not as a stack of separate projects. The floor that carries from entry through the family room, the trim profile the first floor shares, the metal family that threads through the baths. Consistency is what makes it feel like your house.

  4. [ 04 ]

    Systems sized to the new layout.

    We size the electrical panel, the plumbing stacks, and the HVAC runs for the house you’re building, not the one you had. The reward is a decade of nothing surprising you: no tripped breakers, no cold corners, no summer the attic can’t handle.

Home remodeling services

Six decisionsthat make the renovation.

Everything a home remodel actually involves: the honest version, each with the trade-off we’ll walk through with you before you commit.

  1. The way your family actually uses the house.

    01 · The Flow

    The way your familyactually uses the house.

    The flow decides whether Christmas morning holds the whole family in one room or splinters them into three. The current house has a wall where the view wants to be, a doorway where everyone collides, a dining room nobody ever eats in. We walk the house with you and listen for the rooms you quietly avoid before we draw anything on the plan.

    What to consider

    “Which room in your house does your family drift toward, and which one has quietly been a dead zone for years?”

    Non-load-bearing walls move more easily than you'd think. Load-bearing walls get beamed, which costs more, but one well-placed opening often changes the feel of the house more than any addition.

  2. Where your family lives while this is being built.

    02 · The Phasing

    Where your family liveswhile this is being built.

    The phasing decides whether the renovation ends your family's school year on a wobble or settles into the background of it. Which rooms get done first, which stay livable, where the kids sleep in month three, where the laundry gets done in month five. We draw the phasing plan around your family's year before we draw the finishes, so you know what the house looks like at every stage.

    What to consider

    “What months of the year is this house least forgiving of a project, and what months could absorb one?”

    Most families stay in the house through a home remodel. For the loudest six to eight weeks of structural work, a short-term rental is often the easier call, and we'll say so if we see it coming.

  3. The one room in the house that's just yours.

    03 · The Primary Suite

    The one room in thehouse that's just yours.

    The primary suite is the room the two of you end the day in, and in most houses it's the one that got the least thought when the house was built. A bedroom that opens into a bath that opens into a closet, sized for how your life actually fits now instead of how a 1990s floor plan drew it. The suite we design is the thing you walk into at the end of a long day and feel the house catch up with you.

    What to consider

    “What does the end of your day look like right now, and what would you want it to look like a year from now?”

    A primary suite rework usually touches the plumbing stack, which decides whether a second-floor suite is a weekend of pipe work or a long re-routing. We'll flag which category your house falls into early.

  4. The rooms your family actually lives in.

    04 · The Kitchen & Living Spine

    The rooms your familyactually lives in.

    The kitchen and the room next to it are where the family actually spends time, and in a home remodel they get re-planned together, not as two separate projects a year apart. Where the island faces, where the TV ends up, where the kids do homework while dinner cooks. These rooms carry the daily life of the house, and when they're planned as one connected spine, the whole house reads calmer.

    What to consider

    “Where do your kids actually land after school, and does the room welcome that or quietly resist it?”

    Opening a wall between the kitchen and the family room is one of the highest-return moves in a home remodel. The cost shows up in the structural work; the return shows up in every evening of the next ten years.

  5. Where the backpacks, laundry, and groceries land.

    05 · The Daily Machinery

    Where the backpacks,laundry, and groceries land.

    A home remodel is a chance to fix the parts of the house that no one takes a photo of but everyone uses twenty times a week. A mudroom that holds four pairs of shoes without one of them being on the floor. A laundry room sized to actually fold in. A pantry you can see the back of without pulling three things forward. These rooms don't carry the Instagram photo, they carry the week.

    What to consider

    “What's the one small room in your current house that quietly fails every weekday, and what would make it work?”

    A mudroom off the garage entry is one of the cheapest changes with one of the biggest daily returns. A dedicated laundry you can close the door on earns its place every Sunday night.

  6. The quiet pieces that let everything else work.

    06 · The Systems

    The quiet pieces thatlet everything else work.

    The electrical panel, the plumbing stacks, the HVAC runs: the parts of the house no one sees but every finished room depends on. On a multi-room remodel they get sized for the house you're building, not patched for the house you had. The reward isn't a photo; it's the next decade of nothing surprising you: no breaker tripping when the oven and the dryer run together, no cold corner in the back bedroom, no humid summer the attic can't handle.

    What to consider

    “What quiet system failure in your current house have you worked around for years, and would you want it to just stop being a thing?”

    A main-panel upgrade is usually $4,000 to $8,000 and often earns its place on a larger remodel by future-proofing the house for an EV charger, a heat pump, and the appliance load you'll want in year five.

Before & after

A house that readsdifferently after.

Drag the handle to see the home the family was living with against the home they live in now.

A finished home remodel by Revitalize Construction, showing the completed designAfter
The original house before the Revitalize Construction home remodel beganBefore

a Roseville family · 1980s two-story

A split 1980s plan openedinto one connected home.

Home size
~ 2,800 sq ft
Scope
Main floor + primary suite
Finishes
Consistent throughout
On-site
6 months

A 1980s floor plan that split the kitchen from the family room and tucked the primary suite into an afterthought became a connected main-floor spine and a primary bedroom that opens into its own bath and closet, with the whole family on the same side of the house at bedtime.

Start Your Renovation

Investment bands

Three bands,three honest conversations.

Home remodels we take on tend to start from one of three places. Each card names the kind of house it fits and what it includes, priced from the starting figure for construction. Pick the one that sounds like your project.

ClassicHome Remodel

Starting at $250,000

Best for refreshing two or three rooms at once, typically the kitchen and a bath or two, with each room rebuilt in its existing layout and new flooring and paint tying the house together.

What’s included

  • Two to three rooms, same footprints throughout
  • No wall or structural changes
  • Entry-level semi-custom cabinetry and vanities
  • Granite or engineered quartz counters
  • Minimal plumbing and electrical rework
  • Standard fixtures and lighting
  • New flooring and paint throughout the home
  • 12+ week timeline

PremierHome Remodel

Starting at $600,000

Best for a top-to-bottom rework of the whole home, with structural changes, a redrawn floor plan, and custom cabinetry and finishes in every room.

What’s included

  • Whole home, full floor plan redesign
  • Bearing wall removal with engineered beams
  • Custom cabinetry and millwork throughout
  • Marble, quartzite, or premium quartz counters
  • Full plumbing, electrical, and mechanical upgrades
  • Designer fixtures and lighting
  • New flooring and finishes throughout the home
  • 20+ week timeline

Starting prices are construction only. Planning, design, and permitting run through our pre-construction agreement, required on every project and credited back when you sign the construction agreement. Your actual number depends on existing conditions, material selections, and anything we find once the walls open. We’ll give you a real range at the site walk and a locked price after design and selections, not before.

The home remodel process

Five steps.You approve each one.

Every stage of the renovation has a deliverable you can hold, review, and sign off on before we move to the next one.

[ 01 ]

Walking the house

We walk every room with you, not just the ones you're planning to renovate. The rooms you quietly avoid, the walls you've always wanted to open, the one closet nobody can close. We ask how the family actually moves through the house on a weekday and on a Saturday. Free, up to an hour, and an honest read before we draw anything.

[ 02 ]

One plan for every room

Floor plans for every renovated room, phasing drawings showing which rooms are usable when, systems upgrades, consistent finish palette across the house, all on one coordinated set of drawings. 3D views for the big calls (open plan vs. defined rooms, kitchen island orientation, primary suite footprint). Nothing moves to pricing until you've signed off on the plan.

[ 03 ]

Selections & pricing lock

You pick the specific finishes room by room with a consistency check across the house: the floor that carries from entry through the family room, the trim profile the whole first floor shares, the fixture family that threads through all the baths. Allowances get swapped for real line items so the final number is honest, not a placeholder.

[ 04 ]

The build, phased

Demo rolls out room by room on the phasing plan we agreed to, so you always know which part of the house is livable and which part is a job site. Rough-in, drywall, finishes, trim-out. One lead carpenter owns the schedule and your questions. Weekly written updates so you know what finished last week and what's starting Monday.

[ 05 ]

The handoff

We walk the finished house room by room with a punch list in hand: a door that catches, a caulk line to touch, a drawer glide to balance. You get the warranty folder for every appliance and fixture, cabinet and finish care notes, systems documentation, and a one-year check-in on your calendar.

Areas we service

Renovations acrossthe Sacramento region.

Crews roll out of Roseville daily. Dispatch range covers Placer, Sacramento, and El Dorado counties.

What people ask

Common questions,honest answers.

Something not covered here? Ask us on the first call. There’s no wrong question.

How long does a home remodel take on-site?

On-site time starts at about 12 weeks for a Classic remodel, 16 for a Signature and 20 for a Premier, counted from demo, and grows with scope. Add 6–10 weeks of design, selections, and permit review ahead of that. We'll give you a realistic range at the brief stage, not after you've signed.

Do we live in the house or move out while you build?

That's the first conversation we have. Many families stay in the house for a phased home remodel. We rotate the work so you always have a livable kitchen, a working bath, and a bedroom to sleep in. For the loudest six to eight weeks of structural or systems work, a short-term rental often makes life easier, and we'll be honest if we think that's the case before you commit.

Can you work with the architect or designer we've already hired?

Yes. We work with homeowners' architects and designers on multi-room projects regularly. We'll fold them into our planning conversations early so the drawings and the phasing and the build line up before anyone orders a finish.

What happens if you open a wall and find something unexpected?

Older houses hide surprises: knob-and-tube wiring in a wall nobody mentioned, a plumbing stack routed where a header belongs, a joist cut around a bath drain that compromised the floor. If we find one, work stops, we document it, and we come back to you with options and real pricing before we touch anything. Nothing gets fixed on an assumption, and nothing gets billed without a change order you've seen.

What's your warranty on this scale of work?

Our workmanship on installation is warranted for one year across the whole scope. Appliances, fixtures, cabinetry, and finishes each carry their manufacturer warranty. We'll tell you what each specific line covers before you pick it. For the structural work, our framing and the engineer-stamped drawings carry documentation we hand you at closeout so a future buyer or inspector has the paper trail.

Do you design the whole project, or should we bring plans?

Both work. Every project has a designer on it: ours, for families who want the whole thing handled start to finish, or the architect or designer you've already engaged. If you bring plans, we'll read them carefully and tell you honestly where we see trade-offs the drawings don't flag yet: phasing, systems load, structural implications on load-bearing walls.

How does the budget conversation actually work?

At the site walk we'll give you a rough band based on scope, the condition of the existing house, and the finishes you're drawn to. After design and selections, we move to final line pricing: real numbers against specified products, not allowances. If the number comes in higher than the band, we tell you where and why, and talk through what we'd cut or swap. We'd rather lose the project at the band stage than surprise you at the contract stage.

Other services

The rest of the workunder the same roof.

Same team, same planning-first approach, same license and warranty paperwork. If a single room is the whole scope, these pages tell you how each piece gets handled.

KitchenRemodeling

The room your family actually lives in, not the one on the floor plan. We walk every wall before demo so the appliance work, the cabinetry run, and the structural pieces behind them are settled before the first countertop gets specified.

See how we do kitchens
BathroomRemodeling

The one room you use first every morning and last every night. From primary-suite rebuilds to a guest half-bath refresh, we scope the plumbing, the waterproofing, and the finish work together so the schedule doesn't surprise you after demo opens the walls.

See how we do bathrooms
RoomAdditions

The square footage you have been talking about for years. We handle foundation through finish: permitting, structural engineering, trade coordination, and the exterior envelope. The result reads as part of the house rather than tacked on at the end.

See how we do additions
Aging in Place& Accessibility

For the family deciding this is the house they stay in. Barrier-free bathrooms, wider doors, ramps, and ceiling lifts, planned around how your family actually moves through the house rather than a code book. A Regional Center Approved Vendor across seven Northern California counties.

See how we plan for aging in place
InsuranceReconstruction

The rebuild starts the day you decide the loss is behind you. We read your carrier's estimate line by line against what the structure actually requires, document the supplements it missed, and run the reconstruction so the finished house feels like home again.

See how we do loss rebuilds

Start here

Not sure whichof these you need?

A site walk sorts the single-room scope from the multi-room one. Honest answer within a week.

Start Here

You’ve been thinkingabout this for a while.

Tell us what isn’t working. We’ll come out, walk the whole house, and send a scope and ballpark within a week. If it isn’t a fit, that’s an honest answer we’re both better off with.

Follow Us

Request a Quote

Tell us about your house.

We’ll reply within one business day with a next step: a quick call, a site walk, or a scope outline.